Completed
(100 tasks)
Shane Frick - Schedule A follow up
Mungo timing follow up
Grant Call
Todd - Clarification on emergency access from corey
Ryan sidewalk date
Glofiber timing
Ryan 2C asphalt/Sidewalk walk
done by 4/24
Mungo settle
2C patch Classic
3C well quotes
Ric W Rock Creek, Hickory Hill, Fire station
Shane Frick - call
send FedEx to Segra
Conner layout carriages
7415 Rhone Court - Label
Look at sign layout, irrigation, fencing, and water flow.
Captured from Justin voice note on 2026-05-06.
send Ryan Green conduit layout
Air well King william call
total asphalt fire department update
Dean Turner Kenn 2B WR #
Well controller and Conduit run?
Rick Riley/Nathan/Kris Call
- Relocation Update
- Comcast conduit layout steps
Cost code invoices
Admin saves
Clark layout pomeroy
Travis ssar
Kennington 2A nd 2B HRSD Easement talk
Chad check send
staging area jason update
-pat confirm here
Pat staging area date
Keys for Pomeroy
-Call post office first
Fence scapes layout send
- entrance fencing
- Cul de sac fencing
Clark staking call
front gazibbo/trail pat
2-3 weeks
Pavilion Julia check
Ryan E&S items - Townes
Hammond follow up 2C
Post Ryan/mungo
Meter follow up / meeting
mccauley carriages mailboxes
Ryan 2B and 3C E&S items
Schultz/Ryan update
dean 3C call
Todd pomeroy items
Corey Conduit
townes
John Bartonstein call
james barefoot call
Corey Glofiber stags
-Ryan update
-Conner update
Resource confirmation BMPs
NK post office call
Jessica smith pricing for stone
Segra Check send / COI & W9
Street signs break away info
Ashley call on cutting
33 & 34 lots and pond
break away and bracket info
Conner date
siding color
Chad carriage homes
Eric salmon 811 call in
call on timing before
DEQ NOT
Carriage Chad - Light design
Loblolly VNG Marcie response
VNG / Peay / Todd Load letter
Conner 3C call on public water
5/8 vs 1 inch
1 inch
need 30 gallons a minute
15,000
Malissa abbot king william
open space county tax
jsmith deposite iv
Matt gammon/corey talk post joe @ bay
Joyce County admin contact
King William DPU dig on utilites
Corey staking
Ryan Punchlist
Follow up on 4/27 for timing
Then follow up with homeowner
Monument sign
Design update
Townes balzer inspection
Central cover sheet
apron notify
-curing timing
Ben May
total asphalt follow up
Travis SSAR
pat parking curbing
Irrigation into 3C question conner
Drone charge
pom easement check (Chad email)
post clearing and staking
Grass cutting
Builder developer once over and send outs
Brandon Borkey Call
Walking trail paving staking check
then check with corey on trail layout
C&K Schedule Cottages & Pavillion
Dayton date
Check on staking conversation
Joyce scan and send
C&K jeff cutting
C&K Rock Creek bay items
lighting design and check with cory
-send email to chad on avb
-and email on closings
Rocky Ford Jeff and customer follow up
Rocky ford driveway
Corey Segra items
Dean and Conner timing
Glofiber - items comcast fiber? - Joint trenching? - Conduit?
Call post rick riley follow up
staking check
Water line tapping?
Boyd Invoice
Stags 2 DPU punchlist
Clean notes to Todd by eow
Sartain original extensions